Karmann Coachbuilts

Website & Forum


Karmann Cheetah

- Partial Restoration

 

Another restoration project

 

by Grenjs

 

Page 10

 




 

   

109. Last task before fitting the roof back on is

to paint the bottom wood

which is exposed to the elements.

110. The new roll of aluminium roof

111. The new roof is offered up and measured to

ensure there's a 5mm overlap.

     

112. Temporarily holding the roof in position whilst creating the double bend for the kitchen slant.

113. Front edging strip back on.

114. 5mm overlap on the sides

     
     

115. The back end wall.

116. View of the top

117. And the other side.

     
     

118. Cleaning the window frames ready to refitting.

119. Ladder and bike rails back on.

120. The back window opening is cut.

     

 

<-- Previous Page | Next Page -->

 

Or select a page: 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14


<--Click here to return to the Main Index