Karmann Coachbuilts

Website & Forum


Tischer

Coachbuilt

Restoration

by

Grenjs

 

Page 09


 

<-- Previous Page | Next Page -->

 

Or select a page: 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10

 




 

   

165. The new overhead cab floor is made.

166. It is inserted onto the vehicle cab. The black foam was prepared and sealed to the metal cab.

167. New insulation is inserted. This is the kitchen wall.

     

168. The rear storage area. New engine hatch, floor

and access door.

169. The new ali arrived...all 26 metres of it.

170. It is stored under cover until we start to

re-skin the Tischer.

     

171. A new sheet of ali is glued to the base

172. Work starts on the overhead cab area

173. Basic Framework made.

     

174. Shiney!

175. Doesn't look bad.

176. More framework is added

   

 

 

   

177. To both sides

178. And then the wall boards are attached

179. Just need to router the openings....

     
     

180. ....and around the tops

181. A new panel is glued to the bulkhead behind the passenger door.

182. The overhead cab walls are completed.

     

183. The kitchen wall is then covered.

184. Much better.

185. Kitchen cabinet is then screwed to the wall

     

186. beginning to look like a kitchen you could use!

187. The kitchen area and overhead cab ceiling framework is then made and another roofboard secured.

188. Hole is cut for the mini Heki.

     

 

<-- Previous Page | Next Page -->

 

Or select a page: 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10


<--Click here to return to the Main Index