    168. 28th APRIL 2011. As the securing locations

    on the side trim was broken, cut pieces of

    Mahogany is used. These will be painted black

    and a screw driven through the centre to secure

    the trim to the Gipsy.

    169. Side trim screwed to the bottom of the off-side.

    170. Rear section and wheel arch is also secured.

         

    171. We have curtains! These will be replaced with a genuine Karmann curtain set in June.

    172. Still plenty to do although it might look complete.

    173. And the bathroom is almost complete.

    Tiles have been fixed to the wall and grouted.

    They just need cleaning off and polishing.

    The sink need to be connected and a shelf secured.

         
         
       

     

    174.

    175.

    176.

         
         
     

     

     

    177.

    178.

    179.

         

     