168.
28th APRIL 2011.
As the securing locations
on the side trim was broken, cut pieces of
Mahogany is
used. These will be painted black
and a
screw driven through the centre to secure
the
trim to the Gipsy. |
169.
Side trim screwed to the bottom of the off-side. |
170.
Rear section and wheel arch is also secured. |
171.
We have curtains! These will be replaced with a genuine Karmann curtain set in
June. |
172.
Still plenty to do although it might look complete. |
173.
And the bathroom is almost complete.
Tiles
have been fixed to the wall and grouted.
They
just need cleaning off and polishing.
The
sink need to be connected and a shelf secured. |